Analisis Dampak Keandalan Sistem Pulverizer Terhadap Daya yang Dihasilkan PLTU
Abstract
Full Text:
PDFReferences
P. X, "Profil Perusahaan PT X," 2011.
S. K. Ratna Bhakti P S, "Perancangan Sistem Pemeliharan Menggunakan Metode Reliability Centered Maintenance (RCM) Pada Pulverizer (Studi Kasus: PLTU PAITON UNIT 3)," Jurnal Teknik ITS, vol. Vol. 6, 2015.
D. Nugroho, "MODIFIKASI OUTLET COALBUNKER DAN OUTLET COAL FEEDER UNTUK MENGATASI PLUGGING BATUBARA
DI PLTU TANJUNG AWAR-AWAR TUBAN," Jurnal keilmuan dan Terapan Teknik, vol. 06, 2017.
E. P. P. X, "Daftar Kerusakan," 2018.
D. m. Indra gunawan, Seto tjahyono, "Perencanaan Preventive Maintenance Mesin CuttingS-250 Haeverising di PT X," Seminar Nasional Teknik Mesin, pp. 499-508, 2018.
C. Ebeling, An Intoduction to Reliability and Maintainabilty engineering. USA: McGraw-Hill, 1997.
S. S. Taufik, "PENENTUAN INTERVAL WAKTU PERAWATAN KOMPONEN KRITIS PADA MESIN TURBIN DI PT PLN (PERSERO) SEKTOR PEMBANGKIT OMBILIN," jurnal optimasi sistem industri, vol. 14, 2015.
I. dhamayantie, "Analisa Pengaruh Beban dan Campuran Batubara Terhadap Biaya Produksi Pembangkitan Listrik di PLTU Indramayu," Jurnal Ilmiah Indonesia, vol. 12, 2018.
d. B. b. d. Niaga, "Harga Batubara," 2018.
I. Faurizal, "Analisis Kerusakan Combustion Chamber Menggunakan Metode FMEA dan RCFA Pada pembangkit Listrik Tenaga Gas," 2018.
S. R. Youda, Adit, "Studi Keadaan Lapangan PT X," I. Maulana, Ed., ed, 2019.
BMKG, "Data curah hujan tahun 2018," BMKG, 2018.
W. Hidayat, "RCFA Plugging batubara dari CHF ke Coal Mill," 2018.
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Seminar Nasional Teknik Mesin